Column Control DTX

Increasing Throughput on the In-Circuit Test (ICT) System

應用說明

Why does test time increase?

 

Firstly, know that longer test times can arise due to various reasons:

– The test generated from the Interactive Program Generator (IPG) may not be optimized for the specific production board revision

– Addition of test options when debugging tests the first time

– Addition of test options during production testing

– Incorrect interrupt analog test

– Incorrect power up

– Using default vector cycle to test digital devices

– Overly long wait during powered test

– Using “safeguard cool” command arbitrarily

– Overly complex test

– Immoderate wait in “testplan” file

– Incorrect GP-Relay usage

– Poorly maintained i3070 system hardware

×

請銷售人員與我聯絡。

*Indicates required field

您希望以何種方式取得相關資訊? *必填欄位
Preferred method of communication? 變更email?
Preferred method of communication?

請點擊按鈕後,提供給是德科技您的個人資料。您可以從 Keysight隱私聲明 中,閱讀到我們如何使用這些資料的訊息,謝謝。

感謝您!

A sales representative will contact you soon.

Column Control DTX