How to Accelerate Network Rollouts with Activation Testing

VisionWorks Service Assurance Platform
+ VisionWorks Service Assurance Platform

Automate Service Activation Testing

Service providers activating cell sites, backhaul, fronthaul, and enterprise fiber must verify that each circuit is correctly installed, functional, and operating at line rate before accepting the service. Field technicians often complete multiple activations per day across locations, so testing must be fast, consistent, and recorded as a reliable reference for installation quality and compliance. After turn-up, operations teams need ongoing performance visibility across cell towers, baseband units (BBUs), and infrastructure behind the service demarcation device, across classes of service.

Manual activation testing requires specialized field equipment and significant technician time spent running tests, waiting for results, and uploading and analyzing data. Under time pressure, setup errors lead to certification mistakes and service issues that require repeat dispatches, costing millions in unplanned truck rolls. Troubleshooting is similarly manual: when a business customer reports a service-level agreement (SLA) breach or outage, a technician is sent to test the circuit before the problem is even confirmed. Teams need automated activation testing that runs in the background while onsite work continues, integrates with existing systems, stores results in inventory, and validates reported problems remotely before anyone is dispatched.

Network Rollout Activation Testing Solution

The Keysight VisionWorks Service Assurance Platform and its test agents automate service activation and assurance across backhaul, fronthaul, and enterprise fiber. A field technician can start line-rate activation tests with a text message, and VisionWorks runs them in the background while other onsite work continues. Each test generates a network birth certificate confirming all parameters were met, stored in the inventory database as a permanent record. VisionWorks integrates with existing test systems, so technicians view results without new interfaces. After activation, ongoing ping, Two-Way Active Measurement Protocol (TWAMP), and messaging tests monitor tower and BBU health across classes of service. When tickets arrive, VisionWorks automatically validates whether a circuit is down before dispatch. A Tier 1 operator reduced activation testing time by more than 70 percent, ran tests seven to 10 times faster, and validated or diagnosed 80 percent of tickets automatically.

See Block Diagram of Network Rollout Activation Testing Solution

How to Accelerate Network Rollouts with Activation Testing

Explore Products for Our Network Rollout Activation Testing Solution

Discover Resources and Insights

Additional Resources for Network Rollout Activation Testing

Related Use Cases

contact us logo

Get in Touch with One of Our Experts

Need help finding the right solution for you?