Wi-Fi 7 Signal Generation, Measurement, and Analysis Bootcamp
  • Courses
  • 16 items

Join Keysight engineers for a skill-building deep dive into Wi-Fi 7. This bootcamp guides you through IEEE 802.11be and the changes it brings to the standard, with demonstrations and step-by-step guidance you can start applying in your design today. By the end of this bootcamp, you will be able to take advantage of the right software to make signal analysis easier and automate your testing process. 

Learn: 

  • What IEEE 802.11be is and how it affects you.
  • How PathWave software can help you analyze, measure, and generate Wi-Fi 7 signals. 
  • How to use Keysight PathWave 89600 VSA, Signal Generation, and Instrument RPA software along with PathWave X-Series Measurement Application. 

This bootcamp is ideal for wireless network engineers and anyone looking to gain a deeper understanding of Wi-Fi 7 signal analysis.

Lessons