3 Companies. Building AI Fabrics for 1.6T.

AI workloads are transforming how data center networks are designed and deployed. In this 20-minute panel discussion, experts from Dell Technologies, Siemon, and Keysight share practical lessons for building high-performance AI fabrics that operate reliably at scale.

Explore the architectural decisions, connectivity options, and validation strategies required to move from theoretical designs to production-ready AI infrastructure. The panel will discuss DAC, active copper, and fiber connectivity, realistic workload emulation, end-to-end system validation, and how organizations can prepare for the transition from 800G to 1.6T.

Meet the Panelists

James Wynia

Senior Product Manager

Dell Technologies

Ryan Harris

Director of Sales Engineering

Siemon

Avik Bhattacharya

Senior Product Manager

Keysight Technologies

Linas Dauksa

AI Technologist

Keysight Technologies

Build for 800G. Prepare for 1.6T.

AI fabrics must move massive east-west traffic, keep GPUs utilized, and maintain predictable performance under synchronized workloads. Bandwidth alone is not enough.

Hear experts from Dell Technologies, Siemon, and Keysight discuss:

  • Designing and validating production-ready AI networks
  • Choosing between DAC, active copper, and fiber
  • Preparing 800G infrastructure for 1.6T
James Wynia, Dell Technologies

"AI fabrics must move massive East-West traffic, keep GPUs fully utilized, and handle synchronized workloads without congestion or delay."

James Wynia, Senior Product Manager, Dell Technologies

Space is Limited. Register for Your Region Today.

Regional Registration Globe

Americas

August 27
10:00 a.m. PT

Regional Registration Globe

SE Asia / India

August 27
11:00 a.m. IST

Europe

Europe

September 3
10:00 a.m. CET

Regional Registration Globe

Taiwan

August 27