testcase TC_BS_ARQ_TXD_BV_H007() runs on Simu system TestAdapter {...}
Generated with T3Doc 2.0 on Fri Jan 30 15:06:31 CET 2009.

Configuration

Specific requirements:
- REG:
- ARQ supported
- DL SF:
- ARQ requested
- ARQ window size set to 8
- ARQ block size set to 16


Description

Test Strategy: The preamble drive the BS(=IUT)into uplink service flow connection established and downlink
service flow connection setting ARQ enabled established with ArqBlockSize
setting to 16 bytes, and ArqWindowSize set to 8.
TS then sends 2 Echo Requests so that it receives Echo Replies corresponding to
16 blocks. TS checks that after ACKing the first 8 blocks, IUT(=BS) sends the next 8 blocks.



Purpose

TP/BS/ARQ/TXD/BV-H007
TP version: 0.0.14
Initial condition: An ARQ connection is established and the IUT is the transmitter on this connection.
The IUT transmits ARQ blocks.
Test purpose: Check that: On receiving an ARQ feedback message, the IUT transmits the subsequent blocks.