Version: $Id$
Generated with T3Doc 2.0 on Fri Sep 05 17:01:10 CEST 2008.
Description
Test Strategy:
Requires means to provoke BS to increment Configuration Change Count
1: The TE activates filtering of broadcast messages to receive DL-MAPs and DCD messages
2: TE receives a first DCD message and stores the DCD change count value i
3: BSUT is triggered to initiate DCD change
4: TE checks that BSUT transmits DCD message with increased DCD change count regularly
Purpose
TP/BS/CDM/CD/BV-H006
TP version: 0.0.12
Initial Condition:
The IUT is operating with several SSs. The current Configuration Change Count is i
Test Purpose:
Check that: To change the downlink channel descriptor, the IUT regularly transmits
a DCD message with the Configuration Change Count = (i + 1 MOD 256).