Column Control DTX

Increasing Throughput on the In-Circuit Test (ICT) System

Application Notes

Why does test time increase?

Firstly, know that longer test times can arise due to various reasons:

– The test generated from the Interactive Program Generator (IPG) may not be optimized for the specific production board revision

– Addition of test options when debugging tests the first time

– Addition of test options during production testing

– Incorrect interrupt analog test

– Incorrect power up

– Using default vector cycle to test digital devices

– Overly long wait during powered test

– Using “safeguard cool” command arbitrarily

– Overly complex test

– Immoderate wait in “testplan” file

– Incorrect GP-Relay usage

– Poorly maintained i3070 system hardware

×

Please have a salesperson contact me.

*Indicates required field

Preferred method of communication? *Required Field
Preferred method of communication? Change email?
Preferred method of communication?

By clicking the button, you are providing Keysight with your personal data. See the Keysight Privacy Statement for information on how we use this data.

Thank you.

A sales representative will contact you soon.

Column Control DTX